News
News
- The factory inspection of tower internals includes which items?
- What are the regulations for the acceptance, inventory, inspection, and storage of tower internals?
- Distillation Column Stainless Steel Corrugated Packing and Distributor Removal and Installation Site
- Tray Tower Internals Composition
- What Factors Affect the Performance of Wire Mesh Demisters?
Contact Us
China Office
Tel:+86 13627992128
Saudi Arabia Office
Tel: +966 0501811778
Algeria Office
Tel: +213 0556974744
Email:[email protected]
address:South Avenue, Ceramic Industry Base, Pingxiang City, Jiangxi Province, China
Industry News
What are the regulations for the acceptance, inventory, inspection, and storage of tower internals?
- author:pxydhg
- inputtime:2025-02-24
- hits:1
Acceptance, inventory, inspection and storage of tower parts shall comply with the following provisions:
First, the tower parts delivered for installation shall meet the design requirements, with factory certificate of conformity and installation instructions and other technical documents.
Second, the tower parts should be opened in the relevant personnel to participate, against the packing list and drawings, according to the following project check and inventory, and fill out the “tower parts acceptance inventory record.
1. Box number, number of boxes and packaging; 2.
2. Name, specification, model and material of the inner parts.
3. The size and quantity of the inner parts.
4. Surface damage, deformation and corrosion condition of the inner parts.
Third, the installation of internal parts, tower plate, liquid drop plate, beams, etc. can be placed on the site for safekeeping, but to prevent deformation, damage, corrosion and so on; the site should be kept flat and clean, does not affect the construction of other projects.
Easy to report easy to lose parts, should be labeled according to specifications, stored in the warehouse for safekeeping.